Featured job
Top Urgent Required:
1. Piping Foreman 25 SAR (10 Nos) Marjan Normal Documents
2. Piping Fabricator 21 SAR (40 Nos) Marjan Normal Documents
3. E&I Foreman 24 SAR (15 Nos Berri Project)
4. Manlift Operator 20 SAR (20 Nos Berri Project)
5. RIGGER lll 50 SAR (10 Nos Berri Project)
Note: (3.4.5 are required chamber of Commerce. working location Jubail Berri Project)
After selected immediately Mobilized.
KSA Contract No: 0571162321
KSA Contract No: 0583786221
Email : [email protected]